House Building ICF: What's Next?



August 15-19, 2017. One week after pouring concrete into the upper ICF level. The contractor to build the roof was not able to start this week. Scott transports all the roofing materials and cuts the tree in prepared places for the deck and attic of the attic. We removed most of the tape and support from the walls and windows that were needed during the concrete. The beveled boards were placed above the top plates.